Gents,
Given the pressure of work, there is no need to respond immediately to the below, and given the logisitics (down the hill) I think base terrain, boards and tables will not present any problems whatever the requirement.
Barry, Peter, I should almost manage the 40 plain tiles. I shall confirm.
Are cut outs 2x2, or 4x2, I assume 2 number cut outs on one edge, or do you want to be daring and have one on each long edge diametrically opposed
(Just for the board and support table layouts you understand). I'll run off table plans for these alternatives, and you can choose on the night if desired.
Hills and contours available by the bucket load.
Rivers I can supply within reason, but road tiles I would have to leave in Peter's domain. Alternative is using latex roads.
Dale and the KWC contingent are organised re transport and hall
Kind regards,
and best wishes
Bob
"There is no retreat from here, men," Campbell told them as he rode down the line, "you must die where you stand."